2.2 Symbols
M——seismic magnitude;
Muz——upper limit magnitude of a seismic zone or belt;
b——correlation coefficient of magnitude and frequency;
M0——lower limit magnitude of a seismic zone or belt;
——annual average occurrence rate of earthquake of magnitude M0 and above in a seismic zone or belt;
Mu——upper limit magnitude of a potential seismic source zone;
——space distribution function of earthquakes in a potential seismic source zone,the space distribution function of earthquakes in the ith potential seismic source zone and at the jth magnitude step;
f(θ)——directional probabilistic distribution function of potential seismic source zone.